Skip to content

Part Q Security Standards for Dwellings

Door and window security requirements for new dwellings in England, including PAS 24 standards, letter plate specifications, and accessible window requirements, referencing Approved Document Q: Security in Dwellings (2015 edition).

Door Security Requirements (AD-Q Section 1)

RequirementStandardNotes
All external doorsetsPAS 24:2016Includes front, rear, side doors
Door to garage (if integral/attached)PAS 24:2016Door from garage into dwelling
Communal entrance doors (flats)PAS 24:2016 + access controlAudio/visual entry system recommended
Cylinder securityTS 007 3-star or equivalentAnti-snap, anti-pick, anti-bump, anti-drill
Multi-point lockingIntegral to PAS 24 doorsetAt least 3 locking points

Window Security Requirements (AD-Q Section 2)

Window LocationPAS 24 Required?Notes
Ground floorYesAll ground-floor windows
BasementYesAll basement windows
Accessible from balcony/flat roofYesWithin 3.5 m of ground/accessible surface
Adjacent to drainpipe (within reach)YesIf a drainpipe provides easy access
Upper floor (not accessible)NoLockable handles recommended

Letter Plate and Door Hardware (AD-Q)

FeatureRequirement
Letter plateRestricted aperture or internal cowl to prevent lock manipulation through the letter box
Door viewer (spy hole)Recommended for front doors without glazed vision panel
Door chain / limiterRecommended for front doors
Hinge boltsIntegral to PAS 24 doorset (prevent hinge-side attack)
Door frame fixingSecure fixing to structure — integral to PAS 24 installation requirements

Secured by Design (SBD) — Optional Enhanced Standard

Secured by Design is a police-backed initiative that goes beyond Part Q requirements. SBD certification requires PAS 24 doors and windows plus additional measures such as perimeter fencing, lighting, landscaping design, and access control. Many local authorities require SBD compliance through planning conditions, particularly for social housing.

Related Calculators

Use the Part M Door Widths reference for accessibility requirements, or the Part B Fire Resistance Ratings for fire door specifications.

Always check the latest edition of Approved Documents on the Planning Portal (planningportal.co.uk) as regulations are updated periodically.

How We Calculate This

Frequently Asked Questions

Last updated: April 2026

All calculations are estimates. Verify with your supplier.