Double Board Calculator — Staggered Joints, Screws & Compound
Calculate plasterboard, screw lengths, joint tape and compound for double-boarded walls and ceilings with staggered joints.
Total area to double-board
Determines board type recommendation
First layer board
Second (face) layer board
Per 150m roll of joint tape
Per 25kg bag of compound
How We Calculate This
This calculator determines the plasterboard, screws, tape and compound needed for double-boarding with correctly staggered joints.
The formula
Boards per layer = (Wall area ÷ Board area) × (1 + Waste %)
Total boards = Boards per layer × 2
For 20 m² wall area: boards per layer = 20 ÷ 2.88 × 1.1 = 8. Total = 8 × 2 = 16 boards. Inner screws (32mm): ~264. Outer screws (42mm): ~330.
Screw specification
- Inner layer: 32mm screws at 300mm field centres
- Outer layer: 42mm screws at 150mm perimeter, 300mm field
- Staggered joints: Minimum 600mm offset between layers
- Tape: Outer layer joints only
Frequently Asked Questions
Related Calculators
Plasterboard Calculator
Calculate plasterboard sheets for walls and ceilings including joint tape, filler, screws and nogging.
Metal Stud Partition Calculator
Calculate metal studs, track, boards and nogging for partition walls.
Resilient Bar Calculator
Calculate resilient bars, screws and acoustic performance gain by configuration.
Fire-Rated Wall System Calculator
Calculate fire-rated wall board layers, screw lengths and intumescent sealant.
Sound-Rated Wall Calculator
Calculate Part E sound-rated wall system materials by target dB.
Last updated: March 2026
All calculations are estimates. Verify with your supplier.