TradeCalculator.co.uk
Conduit Bending Calculator
Calculate conduit bend dimensions, gain, marking positions, and total conduit length for 90-degree, 45-degree, offset, saddle, and kick-back bends.
Desired straight run before the bend
Desired straight run after the bend (for offsets, the shrink is reported so you can position the second fixture)
45° standard, 30° for gentler offset
Extra for cutting/fitting
Safety notice
Electrical work in dwellings can be notifiable under Part P of the Building Regulations. Treat these figures as planning guidance only: circuits must be designed, installed and certified to BS 7671 by a competent person, normally a registered electrician.
Next up: related pages
How We Calculate This
This calculator determines conduit bend dimensions, marking positions, and total conduit length for common bend types used in electrical installation.
Bend Types
- 90° bend: Gain (deduct) = 2r − πr/2 = 0.4292 × former radius. Total = leg A + leg B − gain
- 45° bend: Single change of direction; deduct = r × tan(22.5°)
- Offset: Travel between marks = offset ÷ sin(angle); shrink = offset × (1 − cosθ)/sinθ. Two bends.
- Saddle: Three bends (60° centre, 30° outers) to clear an obstacle. Centre-to-outer mark spacing = obstacle depth ÷ sin 30° = depth × 2.0 (cosecant multiplier)
- Kick-back: Small set to bring conduit off a surface
Bend Radius
BS 7671 Reg 522.8.3 (via the IET On-Site Guide) sets a minimum INTERNAL bend radius of 2.5 × the outside diameter — 40/50/62.5/80mm for 16/20/25/32mm conduit. A bending-machine former usually produces a larger radius; this calculator uses typical former radii (confirm against your bender):
- 16mm conduit: ~50mm former radius (40mm code minimum)
- 20mm conduit: ~75mm former radius (50mm code minimum)
- 25mm conduit: ~100mm former radius (62.5mm code minimum)
- 32mm conduit: ~125mm former radius (80mm code minimum)
Frequently Asked Questions
Gain (also called 'deduct' or 'take-up') is the length of conduit saved by a bend compared with running two straight pieces into a square corner. For a 90° bend the gain is NOT the full bend radius — it is 2r − πr/2 = 0.4292 × the former radius, because the curved quadrant arc (πr/2) replaces 2r of square-corner length. For example a 20mm conduit on a 75mm former gives a gain of 2×75 − π×75/2 ≈ 32mm, not 75mm. Subtract the gain from your measured lengths to get the correct cutting length, otherwise the conduit ends up too long.
BS 7671:2018 Regulation 522.8.3 requires every bend to be made so cables are not damaged; the IET On-Site Guide expresses this as a minimum INTERNAL bend radius of 2.5 × the outside diameter — so 16mm conduit = 40mm, 20mm = 50mm, 25mm = 62.5mm, 32mm = 80mm. In practice a bending machine former produces a larger radius than the code minimum (this calculator uses typical former radii of 50/75/100/125mm for 16/20/25/32mm — confirm against your own bender), and a larger radius makes cables easier to draw in. A proper bender with the correct former keeps the radius constant; hand-bending risks kinks and flat spots that breach 522.8.3.
An offset uses two equal-angle bends (typically 45°) to shift the conduit run sideways by a set distance. The travel (distance between the two bend marks along the conduit) = offset ÷ sin(bend angle): for 45° bends travel = offset × 1.414 (√2), for 30° bends travel = offset × 2, for 60° bends travel = offset × 1.155. The shrink — how much shorter the run's straight-line advance becomes — is offset × (1 − cos θ)/sin θ, NOT offset ÷ tan θ (that is the horizontal advance of the offset section). Per unit of offset the shrink is roughly 0.27 at 30°, 0.41 at 45° and 0.58 at 60°; for a 50mm offset at 45° the shrink is about 20.7mm. Mark the first bend, measure the travel along the conduit, mark the second, and shift the far fixture along by the shrink to keep the run on target.
A saddle bend (also called a 'bridge' or 'crossover') is used when the conduit run needs to pass over an obstacle — such as another conduit, a pipe, or a structural member. It consists of three bends: the centre bend (typically 60°) and two equal outer bends (30° each). To mark it, place the centre bend over the middle of the obstacle, then measure each outer mark away from the centre by the obstacle depth × the cosecant of the outer angle — for the 60°/30° saddle that multiplier is 1 ÷ sin 30° = 2.0 (a 30mm-deep obstacle gives 60mm each side, NOT depth ÷ tan 30° = 52mm). A shallower 45°/22.5° saddle uses a 2.6 multiplier instead. The saddle lifts the conduit over the obstacle and returns it to the original level — precise marking is essential, so measure the obstacle depth and width carefully.
Good practice limits a conduit run to two 90° bends (or equivalent) between draw-in points. More bends make cable pulling extremely difficult and risk damaging cable insulation. If your route requires more than two 90° bends, install an additional draw-in box or inspection fitting. Each 90° bend approximately doubles the pulling force required. For long runs with multiple bends, consider using trunking instead. Use our Conduit Fill Calculator to check cable capacity for your conduit size.
Was this calculator helpful?
Last updated: March 2026
Verified against UK standards · estimates only, confirm with your supplier.