Construction Phase Plan Calculator

Determine what your construction phase plan needs to contain

More than one contractor triggers Principal Contractor / Principal Designer appointment (CDM 2015 reg 5).

Drives the fortnightly toolbox-talk and milestone estimates.

Peak headcount — sets welfare provision and number of site inductions.

How We Calculate This

Select your project scope and identify the high-risk activities involved (demolition, asbestos, work at height, excavation, hot works). Enter the project duration, number of contractors and peak workforce size. The calculator gives an indicative estimate of the risk assessments, method statements and toolbox talks you might need, flags whether a Principal Contractor and Principal Designer must be appointed (CDM 2015 reg 5, where more than one contractor works on the project), suggests welfare provision (toilets at the BS 6465-1 / HSE benchmark of about 1 per 7 people, with a washbasin in the immediate vicinity of every toilet), and lists the sections expected in your construction phase plan. These figures are a planning aid only — CDM 2015 and HSE L153 require the plan and facilities to be proportionate and 'suitable and sufficient' for the actual work, with no fixed legal counts.

Frequently Asked Questions

Was this calculator helpful?

Last updated: March 2026

Verified against UK standards · estimates only, confirm with your supplier.