One Coat Plaster Calculator — MultiFinish vs Hardwall Coverage
Calculate plaster bags needed for one-coat application. Compare Thistle MultiFinish at 13mm vs Hardwall at 11mm across different background types.
Total area to be plastered
Select which plaster you are using
Affects coverage rate by 10-20%
Enter your supplier price per bag
How We Calculate This
This calculator estimates the number of 25kg bags of one-coat plaster needed for your wall area. It uses British Gypsum's published coverage rates for the Thistle range, adjusted for different background surface types.
The formula
Bags needed = (Wall area ÷ Coverage per bag) × Wastage factor
Coverage per bag varies significantly by product and background. MultiFinish on plasterboard at 2mm covers 8-10 m²/bag, but the same product at 13mm on blockwork only covers 1.8 m²/bag. Hardwall at 11mm covers 2.0-2.5 m²/bag depending on the substrate. High-suction surfaces always reduce coverage.
Key coverage rates
- MultiFinish on plasterboard (2mm): 9.0 m²/bag
- MultiFinish on blockwork (13mm): 1.8 m²/bag
- Hardwall on blockwork (11mm): 2.2 m²/bag
- One Coat on blockwork (13mm): 2.2 m²/bag
Frequently Asked Questions
Related Calculators
Plaster Coverage Calculator
Calculate how many bags of plaster you need for any wall or ceiling area.
Skim Coat Calculator
Calculate multi-finish plaster needed for skim coating walls and ceilings.
Rendering Calculator
Calculate sand and cement quantities for external rendering.
Dot and Dab Calculator
Work out adhesive needed for dot and dab plasterboard fixing.
Plaster Bead Calculator
Calculate angle bead and stop bead lengths for your plastering job.
Last updated: March 2026
All calculations are estimates. Verify with your supplier.