Pressurised Safety Calculator — G3 Discharge Sizing
Calculate PRV settings, expansion vessel acceptance, T&P valve discharge pipe sizing, and tundish requirements per Building Regulations Part G3.
How We Calculate This
This calculator sizes the safety components for pressurised (unvented) hot water systems in accordance with Building Regulations Approved Document G3 and BS 6700.
Component sizing
- PRV: Set to reduce incoming pressure (typically to 3 bar)
- Expansion vessel: Volume × 0.019 expansion (10°C→65°C) × 1.1 safety
- T&P valve: 90°C / 6 or 7 bar rated
- D1 pipe: Same size as T&P outlet (15 or 22mm)
- D2 pipe: One size larger than D1 (22 or 28mm)
- Tundish: Visible air break in same room as cylinder
Frequently Asked Questions
Related Calculators
Pipe Sizing Calculator
Calculate the correct pipe diameter for your plumbing installation.
Boiler Size Calculator
Determine the right boiler kW output for your UK property.
Hot Water Cylinder Sizing Calculator
Size your hot water cylinder based on household demand.
Radiator Sizing Calculator
Calculate the BTU output needed for each room.
Last updated: March 2026
All calculations are estimates. Verify with your supplier.
