Steel Beam RSJ Calculator — UDL, Moment & Beam Selection
Calculate UDL from floor loading, bending moment and select a suitable S275 steel beam from moment capacity tables.
Clear span between supports
Width of floor supported by beam (tributary width)
Indicative 2026: ~£2–3.50/kg merchant single-beam (often cut); ~£0.85–1.10/kg bulk supply-only. Edit to your quote.
1.5 standard (BS EN 1990)
0 if none
Safety notice
Structural elements must be designed or checked by a structural engineer before construction. Treat these figures as initial guidance for planning and budgeting, not a structural design.
Next up: related pages
How We Calculate This
This calculator determines the required steel beam size by calculating the bending moment from floor loading and selecting a suitable Universal Beam section.
Load calculation
UDL (kN/m) = (Dead Load × 1.35 + Imposed Load × 1.5) × Floor Width
Bending Moment M = wL² / 8 (kNm)
For simply supported beams with uniformly distributed loading.
Beam selection
The smallest S275 Universal Beam with a moment capacity exceeding the calculated bending moment is suggested. This is indicative only — a structural engineer must verify for deflection, shear, LTB and connections.
Frequently Asked Questions
First calculate the total UDL (uniformly distributed load) from the floor area loading multiplied by the supported width. Then calculate the bending moment using M = wL²/8 (for simply supported beams with UDL). Finally, select a beam with a moment capacity greater than the calculated bending moment from the steel section tables. This calculator uses S275 grade steel.
M = wL²/8 is the formula for the maximum bending moment of a simply supported beam with a uniformly distributed load. M is the moment in kNm, w is the load in kN/m, and L is the span in metres. This is the most common loading condition for domestic beams supporting floors or roofs above. Point loads require different calculations.
Yes, Building Regulations require structural calculations by a competent person (usually a chartered structural engineer) for all structural alterations including steel beams. This calculator provides indicative sizing only — it does not account for lateral torsional buckling, shear, deflection limits, web bearing, or connection design. Always get professional calculations. See our Steel Beam Calculator for an alternative sizing estimate.
For domestic floors (BS EN 1991-1-1, Category A): imposed load = 1.5 kN/m² and dead load typically 1.0-2.0 kN/m² depending on floor construction. These are factored by partial safety factors (1.35 for dead, 1.5 for imposed) for ultimate limit state design. Roofs use a lower imposed load — 0.6 kN/m² for a Category H roof with maintenance access only (UK NA to BS EN 1991-1-1), reducing toward zero as the roof slope steepens; add snow load per BS EN 1991-1-3 where it governs (upland/northern sites). Always verify loads with your structural engineer.
Steel price is supplier- and quantity-dependent (2026 estimate, not a fixed rate). Buying a single short domestic beam from a builders’ merchant — often cut to length — typically works out around £2.00-3.50 per kg, which is the default in this calculator. Bulk supply-only universal-beam (UB) pricing is much lower, roughly £820-1,080 per tonne (≈ £0.82-1.08 per kg) for stock sections. A common 203x133x25 UB at 4m span weighs about 100 kg, so material cost ranges from roughly £85-110 (bulk) to £250-350 (single merchant cut). Add £500-2,000+ for installation including padstones, temporary support and making good. Delivery and crane costs are additional. Edit the price field to match your own quote.
Related Calculators
Pile Foundation Calculator
Calculate pile count from total load, pile spacing and ground beam quantities.
Steel Beam Calculator
Estimate steel beam (RSJ) size for domestic openings. Always obtain structural engineer sign-off.
Opening Deduction Calculator
Calculate area to deduct for doors and windows from gross wall area.
Was this calculator helpful?
Last updated: March 2026
Verified against UK standards · estimates only, confirm with your supplier.