Skip to content

Tile Waterproofing Calculator — Tanking Membrane & Accessories

Calculate tanking membrane, joint tape, pre-formed corners, drain collars and primer needed for waterproofing wet areas before tiling.

Total wall area in the wet zone

Shower tray area or wet room floor

Liquid is most common for standard showers

Wall-floor and wall-wall junctions

Niches, half-height walls, shelves

Board joints requiring tape reinforcement

One per floor drain point

Price per unit of membrane

Price per 10m roll of tanking tape

Price per pre-formed corner

Price per drain collar

How We Calculate This

This calculator estimates the waterproofing materials needed to tank a wet area before tiling. It covers liquid or sheet membrane, primer, joint tape, pre-formed corners and drain collars.

The formula

Membrane = Total area × Coverage rate × Coats × (1 + Waste %)

For liquid tanking at 1 kg/m² per coat with 2 coats on 8 m²: 8 × 1.0 × 2 × 1.10 = 17.6 kg. Primer at 0.2 L/m² on the same area: 8 × 0.2 × 1.10 = 1.76 litres.

Key components

  • Primer: Applied to the substrate before membrane at approximately 0.2 L/m² (5 m²/L) to improve adhesion.
  • Tanking tape: Approximately 0.5m per joint/corner seam, embedded in wet membrane.
  • Pre-formed corners: One per internal or external 90° junction.
  • Drain collar: One per floor waste/drain point to seal around the outlet.

Based on manufacturer guidelines from BAL, Mapei, Weber and Schluter for UK wet-room and shower waterproofing systems.

Frequently Asked Questions

Last updated: March 2026

All calculations are estimates. Verify with your supplier.