Drainage Connection Fee Calculator — S106, Build-Over & Bond Costs
Estimate water company Section 106 sewer connection fees, build-over agreement costs, bond requirements and inspection charges.
Per connection (check water company website)
Number of separate connections
Building within 3m of public sewer
Check your water company's charges
Refundable bond if required
Per inspection visit
How We Calculate This
This calculator estimates the total fees payable to the water company for a new sewer connection, including all application and inspection charges.
The formula
Total Fees = (S106 Fee × Connections) + Build-Over + Bond + (Inspection × Connections) + VAT
Typical fee ranges (2025/26)
- S106 application: £200-£500 per connection
- Build-over agreement: £150-£400
- Bond: £1,000-£5,000 (refundable)
- Inspection: £100-£300 per visit
Frequently Asked Questions
Related Calculators
Manhole Calculator
Calculate manhole rings, benching, cover and frame for inspection chambers.
Land Drain Calculator
Calculate perforated pipe, gravel and geotextile for land drainage systems.
ACO Drain Calculator
Calculate channel drain lengths, end caps, outlets and gratings.
Sewage Treatment Plant Calculator
Size a sewage treatment plant by population equivalent per Building Regulations.
Septic Tank Sizing Calculator
Calculate septic tank capacity based on occupants and General Binding Rules.
Last updated: March 2026
All calculations are estimates. Verify with your supplier.