CDM Notification Calculator

Determine if your project requires F10 notification to HSE

Working days the construction phase is scheduled to last (not calendar days).

Largest number of workers on site simultaneously at any single point - not the total headcount over the project.

Sum of (workers × days) across the whole project. E.g. 10 workers for 50 days = 500 person-days.

How We Calculate This

Enter the project duration in working days, the maximum number of workers on site at any one time, and the total person-days of construction work. The calculator checks both CDM 2015 Reg 6 notification thresholds — more than 30 working days AND more than 20 workers simultaneously, OR more than 500 person-days — and tells you if an F10 is required. It treats appointments separately: a Principal Designer and Principal Contractor are only required where there is more than one contractor (Reg 5(1)), even on a notifiable single-contractor job. A Construction Phase Plan is required on every project (the sole contractor draws it up under Reg 15(5); the principal contractor under Reg 12(1)), while the formal Health & Safety File (Reg 12(5)) is only required where a Principal Designer is appointed — i.e. multi-contractor projects.

Frequently Asked Questions