Calculate materials for a mansard loft conversion: 72-degree slope cladding, flat top insulation, structural steel frame, dormer windows and floor area.
Length of mansard wall
Floor to eaves of flat section
Width of flat roof section
Length of flat roof (usually = wall length)
Width of dormer windows (a 1.8 m dormer height is assumed for the front-area figure)
All-in cost per m² floor area
Standard mansard: 72°
Next up: related pages
How We Calculate This
This calculator estimates materials for a mansard loft conversion based on the rear wall and flat top dimensions. The ×1.1 factors below are an assumed 10% waste/overlap allowance (a trade convention, not a standard) — typical for cutting tiles or slates on the clad slope; membrane waste on the flat top is usually lower, so treat that figure as conservative.
The formula
Sloped Wall Area = Length × (Height / sin(72°)) × 1.1 assumed waste
Flat Roof Area = Width × Length × 1.1 assumed waste
Steel Frame (indicative budgeting run only) = Wall Length + 2 × Flat Top Length. This is a rough total length for early pricing — it is not a beam schedule. Real mansard steelwork (floor/binder beams, eaves and ridge beams, party-wall beams, vertical posts and padstones) is bespoke and must be sized by a structural engineer to the Eurocodes (BS EN 1993 + UK NA) from the actual spans and loads.
Dormer Front Area = Dormer Width × 1.8 m (a 1.8 m dormer height is assumed; adjust if your dormer differs).
Key elements
- Sloped wall: 72° angle, tile/slate clad
- Flat top: Warm roof, EPDM/GRP membrane, 0.15 W/m²K (AD L 2021 Table 4.2)
- Steel frame: Posts, beams and connections — engineer-designed
- Dormer: Windows in the steep slope face
Frequently Asked Questions
A mansard conversion raises the rear (and sometimes side) roof slope to almost vertical (typically 72 degrees), with a small flat section at the top. This maximises internal headroom and floor space. The steep slope is clad in tiles or slate to match the roof. Mansard conversions usually require planning permission.
The 72-degree angle is a planning convention — steep enough to maximise internal space while remaining clearly a 'roof slope' rather than a wall. Some councils accept steeper angles (up to 80°). The angle also allows tiles or slates to be hung properly with gravity keeping them in place.
Almost always yes. Mansard conversions are not usually Permitted Development because they significantly alter the roof shape and height. Full planning permission is required in most cases. In conservation areas and on listed buildings, additional consents may be needed.
A mansard requires a steel frame to support the new roof shape. This includes horizontal beams at eaves and ridge level, vertical posts at intervals along the wall, and connections at the junction between the steep slope and flat top. Party wall beams and padstones at bearing points are also needed. The steel must be sized by a structural engineer to the Eurocodes (BS EN 1993 for steel, BS EN 1990/1991 for loading, with the UK National Annexes) from the actual spans and loads — this calculator gives only an indicative total run for early budgeting, not a beam schedule.
The flat top is typically a warm roof construction with firring pieces for drainage fall (1:40 minimum), 150mm+ PIR insulation, an EPDM or GRP membrane, and plasterboard below. As a new roof element in an existing dwelling, it must meet the AD L 2021 (Vol 1, incorporating 2023 amendments) Table 4.2 limiting standard of 0.15 W/m²K — this single roof figure applies to both the flat top and the steep slope. Drainage is via an internal gutter or outlet to a downpipe.