TradeCalculator.co.uk
UK Competent Person Schemes — Self-Certification
Complete list of UK competent person schemes for building regulations self-certification: electrical, gas, windows, solid fuel, renewables, plumbing and more.
Electrical Installation (Part P)
| Scheme | Operator | Coverage |
|---|---|---|
| NICEIC | NICEIC Group Ltd | All domestic electrical work under Part P |
| NAPIT | NAPIT Registration Ltd | All domestic electrical work under Part P |
| ELECSA | ELECSA Ltd | All domestic electrical work under Part P |
| STROMA | Stroma Certification | All domestic electrical work under Part P |
| BRE | BRE Global | All domestic electrical work under Part P |
Gas Installation (Part J)
| Scheme | Operator | Coverage |
|---|---|---|
| Gas Safe Register | Capita Gas Registration and Ancillary Services Ltd | All gas work — LEGALLY REQUIRED for anyone working on gas |
Note: Gas Safe registration is not optional — it is a legal requirement under the Gas Safety (Installation and Use) Regulations 1998. It is a criminal offence for anyone who is not Gas Safe registered to carry out work on gas fittings.
Windows, Doors and Glazing (Part L)
| Scheme | Operator | Coverage |
|---|---|---|
| FENSA | Glass and Glazing Federation (GGF) | Replacement windows and doors (most popular scheme) |
| CERTASS | CERTASS Ltd | Replacement windows and doors |
| GGFi / BFRC | GGF / BFRC | Window energy ratings and compliance |
Solid Fuel, Biomass and Chimneys (Part J)
| Scheme | Operator | Coverage |
|---|---|---|
| HETAS | HETAS Ltd | Solid fuel, wood burning stoves, biomass, chimneys and flues |
| OFTEC | Oil Firing Technical Association | Oil-fired appliances and storage tanks |
Renewable Energy and Microgeneration
| Scheme | Operator | Coverage |
|---|---|---|
| MCS | Microgeneration Certification Scheme | Solar PV, solar thermal, heat pumps, wind turbines, biomass |
| RECC | Renewable Energy Consumer Code | Consumer protection for renewable installations |
Note: MCS certification is required for access to the Smart Export Guarantee (SEG) for solar PV and for the Boiler Upgrade Scheme (BUS) for heat pumps.
Other Competent Person Schemes
| Work Type | Schemes | Building Regs Part |
|---|---|---|
| Plumbing and heating | APHC, CIPHE, SNIPEF (Scotland) | Part G (water), Part L (heating) |
| Cavity wall insulation | CIGA, BBA, NIA | Part L (conservation of fuel and power) |
| Air conditioning / ventilation | BESCA, HVCA | Part F, Part L |
| EV chargepoint installation | NAPIT, NICEIC, OZEV-approved | Part P, Part S |
Related Pages
See the BS 7671 18th Edition Changes, the Part P RCD Requirements, and the Part J Flue Sizing.
Frequently Asked Questions
Related Calculators
Part L 2021 U-Value Targets
Part L 2021 target U-values for all building elements with notional dwelling values.
Part B Fire Resistance Ratings
AD-B fire resistance periods: 30, 60, 90, 120 min ratings by building type for walls, floors, doors and structural elements.
UK Joist Hanger Sizes
Standard joist hanger sizes for 47 mm and 75 mm timber with masonry and timber-to-timber types and safe working loads.
UK DPC Specifications
DPC types, widths and placement rules per Approved Document C for UK building construction.
Was this calculator helpful?
Last updated: April 2026
Verified against UK standards · estimates only, confirm with your supplier.