Ventilation Commissioning Calculator — Flow Balance Check
Check ventilation system commissioning by comparing target vs measured flow rates at each terminal. Flags terminals below design (the Approved Document F pass test) and applies the BSRIA BG 49 ±10% air-balance tolerance.
Or leave blank and enter total below
Divided equally if per-terminal not set
Enter one value per terminal, separated by commas
BSRIA BG 49 air-balance band (default ±10%). Note: ADF F requires measured ≥ design — shown separately.
Specific fan power from the unit data plate or measured at the test point
Part L limits (Domestic Building Services Compliance Guide): MEV ≤ 0.7, supply ≤ 0.5, MVHR ≤ 1.5
Next up: related pages
How We Calculate This
This calculator compares target design flow rates against measured flow rates for each ventilation terminal to assess system balance and compliance.
Commissioning check
- Enter the target flow rate per terminal (or total divided equally)
- Enter measured flows as comma-separated values
- Each terminal is checked against the BSRIA BG 49 ±10% balance tolerance
- Any terminal reading below 100% of design is flagged separately, because the Approved Document F pass test is measured ≥ design
- Overall system balance is verified
Pass/fail criteria
The Building Regulations pass criterion for new dwellings is set by Approved Document F Volume 1 (2021), Appendix C: the measured air flow at each fan/terminal must be equal to or greater than the design value. A terminal below design is not compliant and must be adjusted until it matches design — there is no negative allowance in ADF.
The familiar ±10% air-balance band comes from BSRIA BG 49 (Commissioning Air Systems), a best-practice tolerance for balancing, not a Building Regulations requirement. This tool reports both: terminals within ±10% (the BG 49 balance check) and terminals below design (the ADF compliance flag). The flow-measuring instrument must itself have ±5% accuracy and be UKAS-calibrated within 12 months (ADF Vol 1, Section 4).
Frequently Asked Questions
Ventilation commissioning is the process of testing and adjusting a ventilation system to ensure it delivers the design airflow rates at each terminal. This involves measuring airflow at every supply and extract terminal with a calibrated flow hood or anemometer, comparing against the design values, and adjusting dampers until each measured rate meets its design value. Under Approved Document F (Vol 1, 2021, Appendix C) the pass test is that the measured rate is equal to or greater than the design value.
For Part F compliance in new dwellings, Approved Document F Volume 1 (2021), Appendix C, sets the pass test as: measured air flow equal to or greater than the design value at each fan/terminal. ADF does not specify a symmetric ±10% band — any terminal reading below 100% of design must be adjusted until it matches design. The ±10% figure widely quoted for air balancing comes from BSRIA BG 49 (Commissioning Air Systems), which is a best-practice balancing tolerance, not a Building Regulations requirement. The flow-measuring instrument itself must have an accuracy of ±5% and be UKAS-calibrated within the last 12 months (ADF Vol 1, Section 4).
Under Part F, ventilation commissioning must be carried out by a competent person. For domestic installations, the installer is usually responsible. The results must be recorded on a commissioning sheet and a copy given to the building control body. For commercial systems, a specialist commissioning engineer is typically engaged.
Approved Document F (Vol 1, 2021), Appendix C, sets out the minimum commissioning sheet: the ventilation system type, design flow rates for each terminal, measured flow rates, the air-flow instrument used with its accuracy and UKAS calibration date, fan speed settings, and the name, signature and date of the competent person who installed and commissioned the system. Specific fan power (SFP) is not part of the Approved Document F record — it is a Part L energy check, with limits set by the Domestic Building Services Compliance Guide (continuous MEV ≤ 0.7, continuous supply ≤ 0.5, MVHR with heat recovery ≤ 1.5 W/(l/s)).
Use a calibrated balometer (flow hood) placed over the diffuser or grille to directly measure the airflow in L/s. For small terminals, a rotating vane anemometer can be used to measure velocity, then multiply by the duct cross-sectional area. The instrument should be calibrated within the last 12 months per BSRIA guidance.