Skip to content

Resin Bound Driveway Calculator — Resin, Aggregate & Primer

Calculate resin, aggregate, primer and edging restraint quantities for a resin bound driveway or path.

How We Calculate This

This calculator determines the quantities of resin, aggregate, primer and edging restraint needed for a resin bound surface.

Material rates

Resin (kg) = Area x Rate per m² x (1 + Wastage%)
Aggregate (kg) = Area x Rate per m² x (1 + Wastage%)
Primer (L) = Area x 0.3 L/m² x Coats x (1 + Wastage%)

At 18mm standard depth: 1.5 kg/m² resin, 27 kg/m² aggregate. The resin-to-aggregate ratio is critical for proper binding — too little resin causes loose stones, too much creates a sticky surface.

Frequently Asked Questions

Last updated: March 2026

All calculations are estimates. Verify with your supplier.