Skip to content

Concrete Volume Calculator — How Much Concrete Do I Need?

Calculate the volume of concrete required for slabs, foundations, and footings. Get ready-mix loads or bag quantities for any shape.

Length of the slab

Width of the slab

Thickness of the concrete

Include wastage allowance

Adds 10% extra — recommended for all concrete pours

10% standard; 15-20% for rough ground or trenches

Your supplier price per m³ for a cost estimate (UK ready-mix is roughly £90-£130/m³ ex-VAT in 2026)

How We Calculate This

This calculator computes the volume of concrete needed based on the shape and dimensions you enter. It supports rectangular slabs, circular slabs, and trench/strip foundations.

The formulas

  • Rectangular slab: Volume = Length × Width × Depth
  • Circular slab: Volume = π × (Diameter/2)² × Depth
  • Trench/strip: Volume = Length × Width × Depth (same as rectangular, entered as trench dimensions)

If your pour is a shape this calculator does not cover — a cone, a sphere, or an L- or T-shaped footprint split into two rectangular sections — our general volume calculator for m³ and litres will work out the total volume for you.

Conversion to delivery quantities

Ready-mix lorries in the UK typically carry 6m³ per load. For smaller jobs, 20kg premix bags each produce approximately 0.009 m³ of concrete.

The 10% wastage allowance accounts for spillage, uneven ground, and over-excavation. A 5-10% allowance is a common trade rule of thumb recommended by ready-mix suppliers; for trenches in rough or over-excavated ground, 15-20% is safer. This is general practice rather than a figure fixed by any single standard — always follow your supplier’s advice.

UK Building Regulations

For structural foundations, refer to Building Regulations Approved Document A (Structure) for minimum concrete depths and widths. Strip foundations for standard domestic walls typically require a minimum of 225mm concrete depth, with trench depths varying by soil type.

Frequently Asked Questions

Was this calculator helpful?

Last updated: June 2026

Verified against UK standards · estimates only, confirm with your supplier.