Ready-Mix Order Calculator — Loads, Part-Load & Pump

Calculate ready-mix concrete order volume, truck loads, part-load surcharges and pump hire comparison.

Calculated volume before wastage

6 m³ standard, 8 m³ largest UK truckmixer

Indicative: C20/25 ~£100–130/m³, varies by grade & region

Indicative: typically £30–60 per part load

Use Concrete Pump?

For restricted access or large pours

Safety notice

Structural elements must be designed or checked by a structural engineer before construction. Treat these figures as initial guidance for planning and budgeting, not a structural design.

How We Calculate This

This calculator determines the order volume, number of truck loads, part-load surcharges and pump hire costs for a ready-mix concrete delivery.

Order volume

Order Volume = Required Volume × (1 + Wastage%)
Full Loads = floor(Order Volume / Truck Capacity)
Part Load = Order Volume - (Full Loads × Capacity)

Costs

Part-load surcharge applies when the final delivery is less than a full truck. Pump hire is added as a fixed minimum-hire price (the 4-hour minimum is already included in that headline figure, so it is added once — not multiplied by hours).

Frequently Asked Questions