Lightwell Calculator

Size a basement lightwell for daylight, drainage pump requirements, guardrail lengths and waterproofing quantities — using the ADL1A 1/20 daylight rule of thumb and Approved Document K guarding.

Floor area of room served — used for the 1/20 daylight rule of thumb (ADL1A guidance, not a Part L minimum)

Internal length of lightwell

Internal width of lightwell

Depth from ground level to lightwell floor

Drainage Pump Required

Almost always required for below-ground lightwells

Guardrail Required

Required where fall >600mm (Part K)

How We Calculate This

This calculator determines lightwell dimensions and associated requirements for basement natural light, ventilation, and fire escape compliance per the Building Regulations.

Daylight check (guidance, not a Part L rule)

Part L imposes no minimum daylight requirement — Approved Document L1A 2010, clause 4.27, states that “no minimum daylight requirement is specified.” As a rule of thumb from that guidance, glazing much less than 1/20 (5%) of the room floor area gives poor natural light, so this calculator flags whether the lightwell opening reaches that 1/20 lower bound. It is advisory only, not a compliance threshold; many habitable rooms are designed nearer 1/10 (England general guide) or 1/15 (Scottish Technical Handbook standard 3.16). For detailed daylight design, BS EN 17037:2018 (which superseded the withdrawn BS 8206-2) sets out daylight-factor and illuminance methods.

Drainage

A drainage pump is needed to remove rainwater that falls into the lightwell. The pump discharges to the above-ground surface water drain via a rising main with a non-return valve.

Waterproofing

Lightwell walls and floor are waterproofed using cementitious tanking slurry. The quantity here uses an indicative ≈1.5 kg/m² per coat × number of coats — always confirm against your chosen product’s data sheet, as rates vary (for example Newton HydroCoat ≈2.8 kg/m² over two coats, Feb Febtank Super ≈3.5 kg/m² over two coats). The waterproofing must integrate with the main basement waterproofing system at the junction.

Excavation volume

Excavation is the lightwell void × an indicative ×1.2 working-space allowance for formwork, wall thickness and access. This is a trade rule of thumb, not a fixed figure — actual over-excavation depends on the retaining-wall construction, any shoring or batter, and site access.