Fire Resistance Calculator

Determine the minimum fire resistance period for structural and separating elements per Approved Document B. Looks up Appendix B, Table B2 requirements by building height, purpose group and element type.

Height of the topmost floor above ground level

Elements requiring fire protection

Indicative fire-protection cost per element

Safety notice

Fire safety measures must satisfy Approved Document B and often need building control approval. Confirm the final specification with building control or a fire engineer before relying on it.

How We Calculate This

This calculator looks up the minimum fire resistance period from Approved Document B, Appendix B, Table B2 (the same table in AD B Vol 1 for flats and Vol 2 for other buildings, 2019 edition incorporating the 2020, 2022 and 2025 amendments — the live document as of 2026). The 2025 amendment renumbered this periods table from "Table B4" to "Table B2"; the values are unchanged.

The lookup

Period = f(purpose group, top-floor height, sprinklers, basement depth)

Unsprinklered ground/upper-storey periods by Table B2 height band:

  • Block of flats: 30 min (≤5m), 60 min (≤11m); above 11m a sprinkler system is mandatory (Note 2) — then 60 min (≤18m), 90 min (≤30m), 120 min (>30m)
  • Office: 30 min (≤5m), 60 min (≤11m and ≤18m), 90 min (≤30m); over 30m requires sprinklers (Note 6)
  • Shop / commercial and Assembly / recreation: 60 min (≤5m to ≤18m), 90 min (≤30m); over 30m requires sprinklers
  • Industrial and Storage: 60 min (≤5m), 90 min (≤11m and ≤18m), 120 min (≤30m); over 30m requires sprinklers
  • Basements (keyed to basement depth, not building height): 60 min (≤10m deep) and 90 min (>10m) for most groups; 90 min (≤10m) and 120 min (>10m) for industrial / storage

The floor over a basement takes the higher of the basement period and the storey period (Table B2 note *). Sprinklers are modelled as the alternate Table B2 column, not a blanket 30-minute reduction. Performance criteria (R / E / I) follow Table B1 and depend on whether the element carries load.

This is a planning-stage guide. Confirm the period, sprinkler obligations and any project-specific provisions with a competent fire engineer and your building control body.