Skip to content

Smoke Vent Calculator

Calculate smoke ventilation requirements for staircases, corridors and basements per Approved Document B and BS EN 12101. Estimate AOV sizes, costs and maintenance.

Floor area served — only drives the 1/40 basement figure

AOVs or vent openings

Supply cost per vent unit

Safety notice

Fire safety measures must satisfy Approved Document B and often need building control approval. Confirm the final specification with building control or a fire engineer before relying on it.

How We Calculate This

This calculator sizes natural smoke ventilation to Approved Document B (2019 edition incorporating 2020 and 2022 amendments) and BS EN 12101. Free area means the declared aerodynamic free area (BS EN 12101-2) or the geometric free area at the minimum cross-section (AD B Vol 1 Appendix D5) — a finished AOV unit is larger than this opening because its free-area ratio is below 1.

Minimum free area

  • Common staircase: vent at head of stair ≥ 1.0 m² (AD B Vol 1 para 3.52)
  • Corridor / lobby: external-wall vent ≥ 1.5 m² (AD B Vol 1 para 3.51a)
  • Natural smoke shaft: cross-section ≥ 1.5 m², minimum dimension 0.85 m, with each vent into and out of the shaft ≥ 1.0 m² (AD B Vol 1 para 3.51b)
  • Basement / car park: combined smoke-outlet area ≥ 1/40 (2.5%) of the storey floor area, high level and evenly distributed around the perimeter (AD B Vol 2 paras 18.6 and 11.4)
  • Atrium, shopping mall, industrial or warehouse: sized by a BS 7346-4 smoke and heat exhaust (SHEVS) fire-engineering calculation by a specialist — there is no fixed percentage-of-floor-area rule
  • Control panel with smoke detectors and manual override on all automatic systems

A basement that is ≤200 m² in floor area and ≤3 m below ground, or one whose rooms have external doors or windows, needs no smoke outlets (AD B Vol 2 para 18.3).

Frequently Asked Questions

Was this calculator helpful?

Last updated: March 2026

Verified against UK standards · estimates only, confirm with your supplier.