CDM Notification Calculator
Determine if your project requires F10 notification to HSE
How We Calculate This
Enter the project duration in working days, maximum number of workers on site at any time, and total person-days of construction work. The calculator checks against both CDM 2015 notification thresholds. It also identifies whether appointments of principal designer and principal contractor are required, and lists the key CDM duties that apply to your project.
Frequently Asked Questions
Related Calculators
Manual Handling Assessment Calculator
Calculate manual handling risk score from weight, frequency, distance and posture.
Noise Exposure Calculator
Calculate daily noise exposure LEP,d from tool dB levels and duration.
COSHH Assessment Calculator
Calculate COSHH workplace exposure limits, ventilation rate and RPE selection.
HAV Exposure Calculator
Calculate hand-arm vibration exposure points from tool vibration and trigger time.
Dust Exposure Calculator
Calculate dust exposure against WEL limits with extraction rate and RPE factor.
Last updated: March 2026
All calculations are estimates. Verify with your supplier.