Part P Notification Calculator — Notifiable Electrical Work
Determine whether your electrical work is notifiable under Part P of the Building Regulations and compare CPS self-certification vs building control routes.
How We Calculate This
This calculator determines Part P notification status based on the type of work and its location.
Notifiable work
New circuits, consumer units, rewires, work in special locations (bathrooms, outdoors), EV chargers and solar PV are all notifiable.
Compliance routes
CPS self-certification (no Building Control fee) or Building Control notification and inspection (£250-£500 fee).
Frequently Asked Questions
Related Calculators
Building Control Fee Calculator
Estimate building control fees for UK domestic projects including plan check, inspection and VAT.
Part L Compliance Calculator
Check element U-values against Part L 2021 targets for walls, floors, roofs and windows.
Part B Fire Strategy Calculator
Calculate fire resistance periods, escape distances and compartment sizes per Part B.
Part E Sound Test Calculator
Check separating wall and floor dB targets and select systems to achieve Part E compliance.
Part F Ventilation Calculator
Calculate Part F ventilation system selection with extract rates and background ventilators.
Last updated: March 2026
All calculations are estimates. Verify with your supplier.